Wednesday, June 3, 2009

Getting Close

Today was supposed to be my last day at work, but, Mike has a doctors appt. this am and asked if I could work tomorrow instead. I said that I could and we will continue working on GH2. It has been hot (mid 90's) the last 2 days. It is supposed to cool down into the 70's tomorrow.

The water cooling system is put together and installed. It still needs water & electric attached to it, but it is straight & level. We had to strip both ends off of the greenhouse and replace with clear polycarbonate sheeting. Mike thought it could be done in a couple of days, but all kinds of things came up that had to be done before we could move on to the next phase. So we have put in three long days and it still won't be done before we leave. All in all a very large project.


We plan to move the coach onto the driveway on Saturday. Our home needs a bath before we hit hit the road, and the driveway is the best place to wash it. It is supposed to rain tonight and tomorrow, but clear Friday and Saturday, I hope we don't get too much rain.

We plan to leave Tuesday with a stop in the Nashville area to see some of the sites there. Then mosey on up to Dundee, OH for the IRV2 rally. We will stop and see some of Ohio as we go.


Ta ta for now

1 comment:

Juju and Harry said...

Hey guys this is such fun we should have been born with a silver spoon
Be safe
Juju